Title
Resolution authorizing the Engineering Department to complete preliminary analysis of the Ebner Coulee Flood Plain Model and to coordinate the feasibility of future full remodel and revision of the floodway.
Fiscal Note
2015-A Corporate Purpose (2015 CIP #99) Stormwater $20,000.00