File #: 17-0144    Version: Name: Resolution authorizing the Engineering Department to complete preliminary analysis of the Ebner Coulee Flood Plain Model and to coordinate the feasibility of future full remodel and revision of the floodway.
Type: Resolution Status: Adopted
File created: 2/1/2017 In control: Common Council
On agenda: 3/9/2017 Final action: 3/9/2017
Title: Resolution authorizing the Engineering Department to complete preliminary analysis of the Ebner Coulee Flood Plain Model and to coordinate the feasibility of future full remodel and revision of the floodway.
Sponsors: Gary Padesky
Attachments: 1. Ebner Coulee Agreement, 2. Resolution, 3. Dir. Finance Report 2-28-17

Title

Resolution authorizing the Engineering Department to complete preliminary analysis of the Ebner Coulee Flood Plain Model and to coordinate the feasibility of future full remodel and revision of the floodway.

Fiscal Note

2015-A Corporate Purpose (2015 CIP #99) Stormwater                                          $20,000.00