File #: 17-1608    Version: 1 Name: River Architects estimate of construction costs: Schematic Design Phase Memorial Pool
Type: Resolution Status: Adopted
File created: 11/3/2017 In control: Common Council
On agenda: 12/14/2017 Final action: 12/14/2017
Title: Amended Resolution presenting the River Architects estimate of construction costs: Schematic Design Phase for Veterans Memorial Pool.
Sponsors: Paul Medinger
Attachments: 1. Third Amended Resolution Adopted 12-14-17, 2. Proposed Second Amended for Council 12-14-17, 3. Amended Resolution 12-7-2017, 4. Resolution, 5. Memorial Pool Report with Concepts 11-8-17, 6. Memorial Pool Estimate 10-3-2017, 7. F&P sign ups 12-7-17, 8. Memorial Pool Committee Considerations 12-13-17
Related files: 16-0295, 16-0317, 16-0656, 16-0993, 16-1051, 17-0212, 17-0646, 17-0727, 17-1306, 18-0499

Title

Amended Resolution presenting the River Architects estimate of construction costs: Schematic Design Phase for Veterans Memorial Pool.